Days 137 to 142 – A fab week for changes in the apartment. The main event was the delivery and installation of the kitchen (bought in Oct 2018) which looks amazing and totally goes with the floor tiles.
Mon and Tue were consumed by fitting the parts of the kitchen dropped ceiling that would sit directly above the kitchen. Wed saw more work done on the dropped ceiling and some more guest en-suite tiling done. The remainder of the week saw the kitchen going in, installation of 3 floor level lights in the main bedroom ensuite and completion of the wall tiles in the guest en-suite (just the sink area to do now).
Next week will see wall tiling in the front cloakroom (downstairs loo) and fitting of the extractor fan mounts above the island.