Day 23 – One of those days where, despite working hard all day, not a lot to show for it!  All NeoStat back boxes are now in, the Main Bedroom air condition prep is underway and I spent a lot of time on the floor making multiple holes in walls for conduit and plumbing pipes to run through.

Tomorrow the cable will be run from the NeoStat boxes to the area I’ve marked out for the underfloor heating control unit (HeatMiser) and I’ll continue preparing aircon locations