Days 60 to 64 – We are plastered!

The plastering indoors is now done and rendering on the roof terrace area also done.  The difference plaster makes is extraordinary!

The terrace step has been increased in height to accommodate the sliding doors that will be installed.  The waterproof membrane on the terrace is also now installed which will be covered with sand ready for tiling.  The first tiles have been laid in the kitchen.

Looking good so far …..